Your GSPACE Mars GS Quality Inspection Card

Your GSPACE Mars GS Quality Inspection Card
GS Scooter Offline Quality Control Process | GSPACE Official

GS Scooter Offline Quality Status Identification Card V2.0

Rigorous 61-Step Quality Control Process for Every GSPACE Scooter

At GSPACE, we believe that premium quality and uncompromising safety are the foundation of every great riding experience. Every GS scooter that leaves our factory undergoes a comprehensive, 61-step offline quality inspection process, ensuring that each unit meets our strict global standards before it reaches your hands.

This quality control card documents every critical check we perform, from initial appearance inspection to final packaging and shipment preparation. No detail is overlooked, and no unit leaves our facility without passing every single test.

Vehicle Basic Information

□ GS7660 □ GS8440
______________
______________
______________

Full Quality Inspection Process

1. Appearance Inspection

Step Operation Inspection Key Points / Problems Status Judgment
1 Appearance Inspection No scratches, bumps or exposed paint on frame, stem and plastic parts □ Pass □ Rework
2 Appearance Inspection Exposed wiring intact, protective sleeves fitted, cable ties evenly spaced, waterproof plugs installed properly □ Pass □ Rework
3 Appearance Inspection Stickers and nameplates correctly positioned, no bubbles or skew; model verified (battery yellow label + frame No. recorded) □ Pass □ Rework
4 Appearance Inspection Plastic parts for brakes, throttle, buttons and instrument free of damage and obvious scratches □ Pass □ Rework

2. Chassis Assembly

Step Operation Inspection Key Points / Problems Status Judgment
5 Chassis Assembly Front and rear shock absorbers properly installed, undamaged and centered □ Pass □ Rework
6 Chassis Assembly Front and rear tires properly installed and centered □ Pass □ Rework
7 Chassis Assembly Front and rear shock bushings fixed, non-rotating, no abnormal noise □ Pass □ Rework

3. Folding Mechanism

Step Operation Inspection Key Points / Problems Status Judgment
8 Folding Mechanism Two stems parallel and aligned; verified by folding □ Pass □ Rework

4. Accessory Installation

Step Operation Inspection Key Points / Problems Status Judgment
9 Accessory Installation Service card installed (1 NFC card + 1 sticker) + 2 small NFC cards in place □ Pass □ Rework

5. Screw Fastening

Step Operation Inspection Key Points / Problems Status Judgment
10 Screw Fastening Front fork shock screw torque qualified (thread locker applied) 5.5Nm □ Pass □ Rework
11 Screw Fastening Stem folding mechanism spindle screw visually properly installed □ Pass □ Rework
12 Screw Fastening Stem side clamping screws visually properly installed □ Pass □ Rework
13 Screw Fastening Rear swing arm shaft screw visually properly installed (nylon lock nut fully tightened) □ Pass □ Rework
14 Screw Fastening Front and rear motor shaft nuts visually properly installed (lock washer bent and fixed) □ Pass □ Rework

6. Charge/Discharge Port

Step Operation Inspection Key Points / Problems Status Judgment
15 Charge/Discharge Port Charging port 1 & 2 normal; discharging port normal □ Pass □ Rework

7. Initial Status

Step Operation Inspection Key Points / Problems Status Judgment
16 Initial Status NFC main card, 2 sub-cards, default password 0000 valid; power button normal □ Pass □ Rework
17 Initial Status Welcome light on; instrument powers on, clear display, no errors □ Pass □ Rework
18 Initial Status Voltage set: 8440=84V; 7660=76V □ Pass □ Rework

8. Lighting Test

Step Operation Inspection Key Points / Problems Status Judgment
19 Lighting Test Headlight and taillight function normally □ Pass □ Rework
20 Lighting Test Left and right turn signals function normally □ Pass □ Rework

9. Brake & Horn Test

Step Operation Inspection Key Points / Problems Status Judgment
21 Brake Test Electronic brake signal sensitive; brake light responds normally □ Pass □ Rework
22 Horn Test Horn clear, normal volume, no hoarseness or noise □ Pass □ Rework
23 Brake System Check brake fluid level; 2-finger brake test □ Pass □ Rework
24 Brake System Electronic brake triggers before mechanical brake; response timely □ Pass □ Rework

10. G-NUE System Test

Step Operation Inspection Key Points / Problems Status Judgment
25 G-NUE System Bluetooth stable; APP connected; controller/central control updated; Hall identification completed □ Pass □ Rework

11. No-load Test

Step Operation Inspection Key Points / Problems Status Judgment
26 No-load Test Gear 1: no faults, motor quiet, no vibration, tire stable □ Pass □ Rework
27 No-load Test S gear: no faults, motor quiet; downshift to 5 in 30s; no rubbing □ Pass □ Rework
28 No-load Test Visually check tire leakage and anti-puncture gel □ Pass □ Rework
29 No-load Test Record S gear top speed and 30s downshift speed (8440:99/94;7660:93/88) □ Pass □ Rework
30 No-load Test Brake quickly with no leak, delay or noise; brake light normal □ Pass □ Rework

12. System Setting

Step Operation Inspection Key Points / Problems Status Judgment
31 System Setting Auto power off after 5 minutes by default □ Pass □ Rework

13. Indoor Riding Test

Step Operation Inspection Key Points / Problems Status Judgment
32 Indoor Riding Test BOOST mode Gear 5 test; pedal not installed □ Pass □ Rework
33 Indoor Riding Test Motors run smoothly, no noise or vibration □ Pass □ Rework
34 Indoor Riding Test Brake discs no rubbing; lever feel moderate □ Pass □ Rework
35 Indoor Riding Test Shocks compress and rebound smoothly □ Pass □ Rework
36 Indoor Riding Test Stem no wobble; folding mechanism secure □ Pass □ Rework
37 Indoor Riding Test Handlebar rotates smoothly, no jamming □ Pass □ Rework
38 Indoor Riding Test Buttons responsive; acceleration linear □ Pass □ Rework

14. Calibration & Labeling

Step Operation Inspection Key Points / Problems Status Judgment
39 Calibration Gyroscope calibrated; record voltage; power off manually □ Pass □ Rework
40 Label & Cover Replace 100×28 pedal label; install battery cover □ Pass □ Rework

15. Wiring & Sealing

Step Operation Inspection Key Points / Problems Status Judgment
41 Wiring Sealing Seal motor Hall wires and compartment wiring □ Pass □ Rework
42 Cover Installation Install battery compartment cover □ Pass □ Rework

16. Standing & Final Check

Step Operation Inspection Key Points / Problems Status Judgment
43 Standing & Cleaning Stand 12h; power on; voltage difference <0.1V □ Pass □ Rework
44 Calibration Check Recheck gyro data; odometer reset to zero □ Pass □ Rework
45 Parts Installation Install front fender □ Pass □ Rework
46 Cleaning Clean structural parts and tires □ Pass □ Rework
47 Final Cleaning Appearance clean; hang qualified tag □ Pass □ Rework
48 Re-inspection Secondary appearance and wiring check □ Pass □ Rework
49 Re-inspection Stickers, nameplates, service card and tag verified □ Pass □ Rework
50 Sealing 12V silicone cap sealed; instrument wiring disconnected if needed □ Pass □ Rework

17. Packing & Shipment Preparation

Step Operation Inspection Key Points / Problems Status Judgment
51 Packing Prep Carton matched; bottom EPE foam placed □ Pass □ Rework
52 Packing Prep Shipping mark, model and color correctly labeled □ Pass □ Rework
53 Packing Prep Instrument and brake levers covered □ Pass □ Rework
54 Packing Remove kickstand; place vehicle into carton □ Pass □ Rework
55 Packing Verify carton mark matches vehicle □ Pass □ Rework
56 Packing Remove connecting plate 4 and 2 clamps □ Pass □ Rework
57 Packing Install stem protective cover □ Pass □ Rework
58 Document Handling Remove quality card; verify model/color; file to Zhao Rui □ Pass □ Rework